Retaining Wall

A recent completed job that consisted of a re-bar wall, extra strong, single-sided shuttering, was installed due to the thickness and pressure of the concrete. The wall was fixed, erected, poured and stripped within a one week timed programme.

Find images of work process below.

Leave a comment