A base slab consisting of 17 tonne of loose rebar, 77m of shuttering, 2500 sqm of mesh, 173 cubic metres of concrete and fixed/hung numerous bolt boxes. This was a project that was partly started by someone else and left alone for 18 months. We then came in and restarted the job completing tasks such as, lifting out beams and retying and jet washing rebar to the structural engineers satisfaction. All these tasks were completed in 3 weeks – from start to finish.