The project contained 60m of shuttering for showroom windows to sit on.
Category Archives: Uncategorized
Base Slab
A base slab consisting of 17 tonne of loose rebar, 77m of shuttering, 2500 sqm of mesh, 173 cubic metres of concrete and fixed/hung numerous bolt boxes. This was a project that was partly started by someone else and left alone for 18 months. We then came in and restarted the job completing tasks suchContinue reading “Base Slab”
In Situ Staircase
In Situ block staircase.
Retaining Wall
A recent completed job that consisted of a re-bar wall, extra strong, single-sided shuttering, was installed due to the thickness and pressure of the concrete. The wall was fixed, erected, poured and stripped within a one week timed programme. Find images of work process below.
Live Sub Station.
Here are some images of a job we are currently working on, on a live sub station. The work we completed consisted of reinforcement of steel, shuttering and concrete.